Solution to The N-340

The interminable roadworks going on along the N-340 between Almuñécar and Salobreña has reached a decisive point with a new lane having been laid and traffic diverted onto it.

The road surface between Urbanización Alfamar and Barranco Safio, near Hotel Salobreña, has long been a bumpy ride with the whole road threatening to slide down into the sea; hence the work to stabilize the hillside.

The previous efforts to provide a temporary fix had left the road surface very uneven and cracked, causing traffic to reduce speed to a crawl, especially heavy-goods vehicles with delicate loads.

For over a year work has been going on alongside, driving piles into the hillside before laying a completely new, parallel, 2-lane road surface. This ’emergency’ roadwork has a budget of 18.6m euros.

What is not clear is whether this will be a permanent new route for the N-340, or a temporary one until the original surface can be completely overhauled.

(News: Salobrena, Costa Tropical, Granada, Andalucia)