
If you regularly travel up the A-44 to Granada, you will probably have seen the lorries bringing down the huge propeller blades for the wind-powered generators on their way to Motril Port.
Motril Port needs a new direct entrance for long-load, articulated lorries, such as the ones that transport the blades for wind-turbine towers.