Access Lane Improvements

Monday, September 11, 2017
By Hugh MacArthur

LHR Pagos de GuerraAlmuñécar will be improving the condition of the access lanes for its inland, municipal dependencies; namely, Los Bañuelos and El Pago de Guerra.

The Plan Provincial de Cooperación de Obras y Servicios 2016/2017 comes with a combined budget of 215,068 euros for the two projects, explained the Councillor for Public Works, José Manuel Fernández Medina.

Los Bañuelos, which is to the north of Almuñécar, will have the road resurfaced the rain-drainage along its length – almost two kilometres. At present the road surface leaves a lot to be desired. Vegetation on the roadside will also be cut back.

AD Coendul banner

The contract was won by Aridos Anfersa SL with their bid of 111,013 euros plus IVA and should conclude within three months.. 

Meanwhile, above La Herradura in Pago de Guerra, a total of 750 metres of lane will have 62,062 euros thrown at it so that Geocaminos SL can carry out basically the same class of work as in Los Bañuelos, including roadside rain drainage along 625 metres of its length.

It is hoped, in both cases that the work can be concluded before the rains start.

(News: Almunecar/Herradura, Costa Tropical, Granada, Andalucía)

Tags: , , , , , , , , ,

Leave a Reply

You must be logged in to post a comment.